Why Should You Plan for Construction Loan Settlement?

A calm guide for Northmead residents on how settlement, progress draws and final payment work when you build a new home.

Hero Image for Why Should You Plan for Construction Loan Settlement?

Construction loan settlement is a series of payments, not a single day. Knowing how each stage is paid helps you plan your cash flow before the first slab is poured.

If you live in Northmead and are thinking about a knockdown rebuild, a land and construction package or a custom home, the settlement process shapes your costs from the start. Here is how it works, and what to line up early.

What Does Settlement Mean on a Construction Loan?

On a construction loan, settlement usually means two things. The land settles first if you are buying it, then the lender releases money to the builder in stages until the home is finished.

The lender pays the builder against the building contract, so the lender sets the timing of each release. Lenders set their own rules for the number of drawdowns, construction time limits, inspection requirements and fees. Compare these terms before you sign a contract, not after. Our construction loans page explains the main structures, and we can compare lenders across Australia for you.

How Do Progress Payments Work in NSW?

In NSW, progress payments must match the work actually carried out. They can be fixed amounts or percentages tied to completed stages, or amounts claimed as work is done and supported by documents.

NSW law also sets limits that protect you. Under the Home Building Act 1989, the maximum deposit is 10 per cent. Work over $20,000 needs a written contract with a progress payment schedule. Where Home Building Compensation Scheme cover applies, the builder cannot ask for a deposit until the cover is in place and you have the certificate.

Building Commission NSW gives $250 to $500 as an indicative cost for each progress inspection. A lender may arrange its own inspection before each release, so ask whether that cost is passed on to you. Check this with the lender, because the rules are not the same everywhere.

NSW Government guidance says a borrower financing a project home must start mortgage repayments once the first progress payment is made and the loan begins to draw down. Plan for repayments to begin during the build, even though you are not living in the home yet.

Ready to get started?

Book a chat with a Mortgage Broker at House Of Finance today.

What Will Repayments Look Like as the Loan Is Drawn Down?

Repayments typically increase if interest is charged on the drawn balance, but this depends on the lender. Confirm with each lender whether interest is calculated on the amount drawn so far rather than the full approved limit.

Here is an illustrative example using a rate of 6.75% p.a. This is an example only, not a current offer. Consider a Northmead couple building a new home. After the base and frame stages, $250,000 has been drawn. Interest-only at 6.75% costs about $1,406 a month ($250,000 x 6.75% / 12). By the final stage the drawn balance reaches $500,000, and interest-only rises to about $2,813 a month.

What happens after completion depends on the lender and the loan contract. If the loan reverts to a 30-year principal and interest term at the same 6.75%, repayments on $500,000 would be about $3,243 a month. That would be a rise of about $430 a month from the final interest-only amount, on top of the rent or mortgage the couple may still be paying elsewhere during the build.

Whether interest-only repayments are offered during the build also depends on the lender. The couple's broker confirms the terms after the build in writing before they sign the building contract. The couple budgets for the higher figure, so no repayment is a surprise.

Try our borrowing capacity tool to see how different loan amounts affect your repayments.

Why Final Settlement Needs Planning Before the Build Starts

Final settlement should be planned before construction begins. Each lender sets its own conditions for the final drawdown, such as completion documents and inspections, so ask your lender what it requires.

A bank must assess whether you can meet repayments at an interest rate at least 3 percentage points above the loan rate. This is a prudential standard from APRA, the banking regulator. Your repayments could therefore be assessed at a much higher rate than the one you pay. Our home loans team can show you how your income and debts are treated before you commit to a design.

For the lender, a construction loan counts the full approved amount, including undrawn funds, towards the loan-to-valuation ratio. Lenders mortgage insurance is a cost, so ask your lender early whether it applies to your deposit and whether it can be capitalised into a construction loan.

Plan for variations too. Extra work agreed after the contract is signed can add to the final payment, and the loan may not cover it. A buffer of your own savings is a sensible safeguard. The trade-off is that holding savings in reserve means a smaller contribution elsewhere, so decide the size of the buffer with your broker.

Does the First Home Owner Grant Apply When You Build?

In NSW, the First Home Owner Grant is $10,000 for eligible first home buyers, and it can apply to a new build. For vacant land with a building contract, the combined value of the land, contract and any variations must not exceed $750,000.

If you need the grant at settlement or at the first drawdown, the application goes through the approved agent providing your finance. Otherwise, it is lodged within 12 months of settlement or completed construction. For contracts signed on or after 1 July 2023, you must move in within 12 months and live there for at least 12 continuous months. Our first home buyers page covers eligibility in more detail, and you should confirm your own situation with Revenue NSW.

Building in Northmead is a big project, and the loan structure should suit the way your build will be paid. Call one of our team or book an appointment at a time that works for you, and we will walk through your draw schedule, repayments and final settlement before you sign. You can also book an appointment online, or read about our Northmead mortgage broker service.

Frequently Asked Questions

What is construction loan settlement?

It usually means the land settles first if you are buying it. The lender then releases funds to the builder in stages until the home is complete. The timing of each release is set by the lender and the building contract.

When do repayments start on a construction loan in NSW?

NSW Government guidance says a borrower financing a project home must start repayments once the first progress payment is made and the loan begins to draw down. Check with your lender about any special requirements.

Is the maximum deposit on a building contract limited in NSW?

Yes. Under the Home Building Act 1989, the maximum deposit is 10 per cent. Where Home Building Compensation Scheme cover applies, the builder cannot ask for a deposit until cover is in place.

Can I claim the First Home Owner Grant if I build in NSW?

The $10,000 grant can apply to eligible first home buyers building on vacant land. The combined value of land, contract and variations must not exceed $750,000. Confirm your eligibility with Revenue NSW.